A control written in a register is not the same as a control working on site. For any hazard flagged as a critical risk, Forsite tracks each critical control on its own: who verified it, when, whether it passed, and when it is next due. When a verification fails, a corrective action is created on the spot with a seven-day deadline. You do not rely on someone remembering to check.
.png)
Verify each critical control pass or fail, with a full audit trail. Last verified, next due and overdue status stay visible on every critical hazard.
When a verification fails, a corrective action is created straight away with a deadline attached. The failure is tracked until someone resolves it.
Record who was consulted, when, and what was discussed, on the hazard itself. The consultation evidence lives where auditors look for it.
Set a review date, or schedule a recurring annual review in one click. The review lands in the site's scheduled works, assigned and tracked like any other job.
.png)
One screen across the whole company: how many critical hazards you hold, total critical controls, overdue verifications, controls never verified, and recent failures, broken down by site. It is the screen to open before a board meeting or an audit.
Watch a critical risk flagged, its controls verified, a failure raise a corrective action, and the dashboard roll it all up.
You see which critical controls on your site are due or overdue, so a verification never quietly lapses while you run the site. A failed check surfaces straight away as an action to close, not a gap you find out about later.
You decide which risks are critical and how often each control is verified. Verifications, failures and consultations are logged as they happen, so the record you would put in front of the regulator or the board is already built, not reconstructed after the fact.
When you work near a risk that can seriously harm, you are consulted on the controls meant to protect you, and that conversation is recorded against the hazard. You can trust those controls are checked on a schedule rather than taken on faith.
Across every site you hold, you can show that critical controls are being verified on schedule and that failures are being closed out. If something ever goes wrong, that evidence of active management is what protects you and your officers.